Clark Library

The new, modern library was built on the basic root structure of the old. The library renovation and rebuilding project began in May 2012 with the library reopening in August 2013. and is expected to cost an estimated $12.5 million.

Designs called for a new, modern library on the basic root structure of the old. The library is now more than a repository for books and has been transformed into a three-story structure featuring computer workstations, multimedia labs, a classroom, and group and individual study space.